Design, Fabrication, Foundations, Erection, Exteriors for 20+ API 650 Carbon & Stainless Tanks; Construction of piping and structural
(2) 160′ x 70′ API 650 Tanks with EFR
1/2 mile elevated coal conveyor demo and rebuild
(2) 128′ x 56′ API 650 Tanks with EFR-Canada
Air Cooled Condenser Rebundling. Fabrication of steam distribution and condensate collection manifolds. Onsite demolition of existing manifolds, tube bundles and structural and replacement with new.
(18) tanks, (400) tons structural, (14) agitators and drives, (3) thickeners & mechanisms, (8) intermediate screens, (4) 3-deck shakers, 10-ton OH crane & rail, (8) pumps, (3) MCC buildings, (8000′) stainless piping, Plant pre-commissioning crew
(2) 120’Ø x 60′ SCRT’s; (2) 40’Ø x 40′ SCRT’s; (14) 14’Ø x 40′ CRT’s Asphalt Plant
(6) 280′ Flare Stacks and Ignitors for STAR, world’s largest crude oil refinery in Turkey
(2) 55’d x 50′ API 650 Tanks
(2) 62′ Elevated Surge Tanks
Crushers, 750′ overland conveyors, screens, bins, silos, ductwork, process piping, filters, pumps, MCCs,
Fire Sunset Tank
(2) 123’d x 56′ API Tanks w/ IFR
(2) 126′ foundations for API 650 storage tanks
Removal and replacement of expansion joint
(5) 120′ x 56′ API Tanks
155’d x 48′ API 650 Tank
(6) API 650 Tanks (various 32′-65’d)
Stainless Steel API 650 Tank
90’d x 20′ Frac Sands Clarifier
(2) 46’d x 44′ API 650 Tanks
(2) 160′ x 70′ API 650 Tanks with EFR-Canada
(2) 50’d Elevated Oil/Water Separator Tanks
120′ x 40′ API 650 Cone Roof Tank
(6) API 650 Cone Roof Tanks 35′-120′ x 40′
FGD Scrubber Wash Header
50’Ø x 50′ Stainless Acidulation Tank
24’d x 24′ API 650 Tank
API Tank EFR Seal Replacement
Stainless Acid Storage Tank
API Tank Bottom Replacement
45’d x 48′ API 650 Tank
API Tank Clean Out Door
(5) 125′ dia x 56′ API Tanks
60’d x 40′ API 650 Tank
28’d x 28′ API 650 Tank
120’d x 48′ API Tank Bottom & EFR Repair
55’d x 50′ API 650 Tank
Shell Course Replacement with Helical Stairway
API Tank, Ladder & Sample Station
24 Various Storage & Process Tanks
39’d x 67′ Elevated Thickener
Elevated Load Out Bin
Night Work on Elevated Thickener
24’d x 18′ Stainless Steel Acid Tank
(2) 55’d x 32′ Acid Tanks
Exterior Painting of Process Tank
(5) 125’d Elevated Thickeners w/ Scalloped Bottoms
Platform on Tank
148’d Elevated Thickener w/ Scalloped Bottoms
Rubber-Lined Hopper 1
Elevated Reactor Vessel
Multiple Process Tanks
85’d x 45′ Sulfuric Acid Tank
Rubber-Lined Hopper 2
9 Storage & Process Tanks
4 Storage & Process Tanks
FGD Scrubber Wash Header Pick
FGD Scrubber Outlet Duct Pick
Multiple Process Tanks
Water Tank Roof
44’d x 48′ Water Tank
40’d Clarifier Tank
86’d x 27′ Municipal Water Tank
Multiple Process Tanks
Ducting Repairs 2
Clarifier Sub-Assembly
Structural Steel
Spreader Bar
Shop Tank with Galvanized Ladder & Rail
Stair Tower
Ducting Repairs
(4) 13.5’d x 35′ Stainless Steel Tanks
Shop Tank w/ Stair & Rail
(2) 160′ x 70′ API 650 Tanks with EFR-Canada
FGD Scrubber & Stack
Elevated Lime Silo for FGD Scrubber
FGD Wet Scrubber Inlet Construction
62’d x 155′ FGD Wet Scrubber
C276 Outlet Duct for FGD Scrubber
API Tank Single Course Door Sheet
API Tank Shell Manway
API Tank Sample Station
API Tank Roof Manway
API Tank Nozzle
API Tank External Floating Roof Repair
Project fabricated and installed for power plant in WY
API Tank Bottom & 1st Course Replacement
API Tank Access Hatch
API Floating Roof Repair
API Tank 2-Course Door Sheet
API Tank 2-course Door Sheet 2
Tank Nozzle
Shell Manway with Integral Reinforcement
Tank Tear Down & Re-Erect
Rolling Ladder & API Tank EFR 2
Rolling Ladder & API Tank EFR 1
Rolling Ladder
Interior Finish of API Tank with Floating Roof
Handrail & Ladder Modification
Cage Ladder
117’d x 28′ API Tank w/ Internal Floating Roof and Geodesic Dome
Cone Bottom Tank
Crushers, 750′ overland conveyors, screens, bins, silos, ductwork, process piping, filters, pumps, MCCs,
Crushers, 750′ overland conveyors, screens, bins, silos, ductwork, process piping, filters, pumps, MCCs,
(5) elevated clarifiers and mechanisms with hooped bottoms
Center Column and Umbrella on API 650 Tank
1/2 mile elevated coal conveyor demo and rebuild
1/2 mile elevated coal conveyor demo and rebuild
1/2 mile elevated coal conveyor demo and rebuild
155′ x 35′ Clarifier, including internal mechanism and platform
Full Exterior & Interior Blast and Paint
1/2 mile elevated coal conveyor
GC for onsite Mining Laboratory and truck scales; civil, structural, mechanical, APC, electrical, finish, plumbing
GC for onsite Mining Laboratory and truck scales; civil, structural, mechanical, APC, electrical, finish, plumbing
20 large diameter foundations and tanks for terminal
(18) tanks, (400) tons structural, (14) agitators and drives, (3) thickeners & mechanisms, (8) intermediate screens, (4) 3-deck shakers, 10-ton OH crane & rail, (8) pumps, (3) MCC buildings, (8000′) stainless piping, Plant pre-commissioning crew
Crushers, 750′ overland conveyors, screens, bins, silos, ductwork, process piping, filters, pumps, MCCs,
50’Ø x 50′ Stainless Acidulation Tank
50’Ø x 50′ Stainless Acidulation Tank
24 Various Storage & Process Tanks
39’d x 67′ Elevated Thickener
Night Work on Elevated Thickener
24’d x 18′ Stainless Steel Acid Tank
50’Ø x 50′ Stainless Acidulation Tank
50’Ø x 50′ Stainless Acidulation Tank
Exterior Painting of Process Tank
Platform on Tank
148’d Elevated Thickener w/ Scalloped Bottoms
Rubber-Lined Hopper 1
Elevated Reactor Vessel
50’Ø x 50′ Stainless Acidulation Tank
85’d x 45′ Sulfuric Acid Tank
Rubber-Lined Hopper 2
50’Ø x 50′ Stainless Acidulation Tank
Crushers, 750′ overland conveyors, screens, bins, silos, ductwork, process piping, filters, pumps, MCCs,
GC for onsite Mining Laboratory and truck scales; civil, structural, mechanical, APC, electrical, finish, plumbing
GC for onsite Mining Laboratory and truck scales; civil, structural, mechanical, APC, electrical, finish, plumbing
1/2 mile elevated coal conveyor demo and rebuild
Air Cooled Condenser Rebundling. Fabrication of steam distribution and condensate collection manifolds. Onsite demolition of existing manifolds, tube bundles and structural and replacement with new.
Removal and replacement of expansion joint
FGD Scrubber Wash Header
FGD Scrubber Wash Header Pick
Removal and replacement of expansion joint
Removal and replacement of expansion joint
65’d x 155′ FGD Wet Scrubber Inlet
Project fabricated and installed for power plant in WY
1/2 mile elevated coal conveyor demo and rebuild
1/2 mile elevated coal conveyor demo and rebuild
1/2 mile elevated coal conveyor demo and rebuild
1/2 mile elevated coal conveyor
18’d x 100′ Lining of Bleach Tower with Super Duplex Stainless Steel
Ducting Repairs 2
Clarifier Sub-Assembly
Structural Steel
Spreader Bar
Shop Tank with Galvanized Ladder & Rail
Stair Tower
Ducting Repairs
(4) 13.5’d x 35′ Stainless Steel Tanks
Clarifier Mechanism Repair
Cone Bottom Tank
Full Exterior & Interior Blast and Paint
(6) 280′ Flare Stacks and Ignitors for STAR, world’s largest crude oil refinery in Turkey
Ducting Repairs 2
FGD Scrubber Wash Header Pick
FGD Scrubber Outlet Duct Pick
FGD Scrubber & Stack
Elevated Lime Silo for FGD Scrubber
FGD Wet Scrubber Inlet Construction
62’d x 155′ FGD Wet Scrubber
C276 Outlet Duct for FGD Scrubber
GC for onsite Mining Laboratory and truck scales; civil, structural, mechanical, APC, electrical, finish, plumbing
API Tank EFR Seal Replacement
API Tank Bottom Replacement
API Tank Clean Out Door
API Tank, Ladder & Sample Station
Ducting Repairs 2
Stair Tower
Clarifier Mechanism Repair
API Tank Shell Manway
API Tank Sample Station
Tank Nozzle
Crushers, 750′ overland conveyors, screens, bins, silos, ductwork, process piping, filters, pumps, MCCs,
,
Design, Fabrication, Foundations, Erection, Exteriors for 20+ API 650 Carbon & Stainless Tanks; Construction of piping and structural
Air Cooled Condenser Rebundling. Fabrication of steam distribution and condensate collection manifolds. Onsite demolition of existing manifolds, tube bundles and structural and replacement with new. ,
(18) tanks, (400) tons structural, (14) agitators and drives, (3) thickeners & mechanisms, (8) intermediate screens, (4) 3-deck shakers, 10-ton OH crane & rail, (8) pumps, (3) MCC buildings, (8000′) stainless piping, Plant pre-commissioning crew
Crushers, 750′ overland conveyors, screens, bins, silos, ductwork, process piping, filters, pumps, MCCs,
Power Generating Station ACC work
Mining & Aggregates
Project fabricated and installed for power plant in WY
Crushers, 750′ overland conveyors, screens, bins, silos, ductwork, process piping, filters, pumps, MCCs,
1/2 mile elevated coal conveyor demo and rebuild